• About Us
  • Advertise With Us
  • Terms of Use
  • Privacy Policy
  • Contact
Thursday, April 23, 2026
Login
Myliberty Media
  • Home
  • News
    • Entertainment
    • Health
    • Business
    • Maritime
    • Technology
    • Events
    • NGO
    • Science
    • Lifestyle
  • Religion
  • Sports
  • Education
  • Economy
  • Environment
  • Crime
  • Parliament
  • Social
  • Politics
  • World
    • Africa
    • Americas
    • Asia
    • Europe
  • Media
    • TV
    • Radio
    • Podcast
    • Video News
  • Home
  • News
    • Entertainment
    • Health
    • Business
    • Maritime
    • Technology
    • Events
    • NGO
    • Science
    • Lifestyle
  • Religion
  • Sports
  • Education
  • Economy
  • Environment
  • Crime
  • Parliament
  • Social
  • Politics
  • World
    • Africa
    • Americas
    • Asia
    • Europe
  • Media
    • TV
    • Radio
    • Podcast
    • Video News
MyLiberty Media
  • Home
  • Business
  • Crime
  • Politics
  • Economy
  • Education
  • Entertainment
  • Environment
  • Health
  • Sports
  • Lifestyle
  • Technology
  • Parliament
  • Events
  • General News
  • Politics
  • Religion
  • Maritime
  • Social
  • World
  • Video News
  • TV
  • Radio
  • Podcast
Home Social

Faulty 33kV underground cables causing frequent power outages in Dawhenya, environs

By Laudia Sawer

Frank Atiase by Frank Atiase
March 16, 2023
in Social, Headlines
Reading Time: 2 mins read
ECG3
Share on FacebookShare on TwitterShare on Linkedin

Tema-Ghana, March 16, GNA – The Tema Regional Office of the Electricity Company of Ghana (ECG), has linked the frequent power outages experienced in and around Dawhenya to faulty 33kV underground cables.

Customers of the ECG in Dawhenya, Prampram, Ada, and their surroundings have been experiencing intermittent power outages with some having to sleep in the darkness for days.

Ms Sakyiwaa Mensah, the Tema ECG Regional Public Relations Officer, in an interview with the Ghana News Agency on Thursday, confirmed that some faulty 33kV underground cables had been identified as the cause of the problem.

RelatedNews

WCRD 2026: FDA pushes stronger consumer awareness on safety

March 18, 2026

New emoluments policy to reform public sector pay

March 18, 2026
ADVERTISEMENT

Ms Mensah said with the underground cables, special equipment was needed by the ECG to locate the faults before they could be repaired, and this often took time to identify the spot and repair anytime they occurred.

She said as a short-term solution, portion of the cables which were more prone to faults were being replaced to stabilise the supply situation temporarily.

She indicated that the ECG had only one substation at Dawhenya which supplied power to Prampram and Ningo, however, there was another one at Tsopoli that catered for Ada and its environs.

“The ECG Tema Region apologises to customers in the Ada, Ningo and Prampram environs for the recent outages,” she said.

Ms Mensah further explained that the Sogakope Substation, as it stood currently, was a smaller capacity substation and presently working at its peak, hence it could not be used to supply the entire Ada load.

Touching on her outfit’s planed long-term solution, she said new cables were going to be laid in addition to tower line construction to replace the entire length of the existing fault-prone cables.

She added that as part of the long-term solution, the Sogakope substation was to be upgraded to a higher capacity, to serve as an alternative source of supply to feed the entire load anytime there was a challenge from Dawhenya or Tsopoli substations.

The PRO said ECG wishes to apologise to all its customers for the inconvenience caused and assured them of the strenuous efforts being made by its engineers, to restore and normalised power supply to these areas within the shortest possible time.

Source: Ghana News Agency
Tags: DisruptionsPower
Share601Tweet376Share105SendShare
ADVERTISEMENT
Frank Atiase

Frank Atiase

Related Posts

Social

WCRD 2026: FDA pushes stronger consumer awareness on safety

March 18, 2026
Economy

New emoluments policy to reform public sector pay

March 18, 2026
Economy

Organised Labour demands comprehensive incomes policy for public sector pay

March 18, 2026
Social

Prez Mahama urges organised labour to support ECG restructuring plans

March 18, 2026
GNFS
Social

Western Region GNFS embarks on ‘catch them young’ campaign

March 11, 2026
Agbana
Social

Agbana backs call for National Youth Development Fund to support young entrepreneurs

March 11, 2026

Ad

Search

ADVERTISEMENT

CATEGORIES

  • Business
  • Court
  • Crime
  • Economy
  • Education
  • Entertainment
  • Environment
  • Feature
  • Financial
  • General News
    • Gossip
    • Opinions
  • Headlines
  • Health
  • Lifestyle
  • Maritime
  • NGO
  • Parliament
  • Politics
  • Religion
  • Science
  • Social
  • Sports
  • Technology
  • Top Stories
  • Video News
  • World
    • Africa
    • Americas
    • Asia
    • Europe

Recent Posts

  • WCRD 2026: FDA pushes stronger consumer awareness on safety
  • New emoluments policy to reform public sector pay
  • Organised Labour demands comprehensive incomes policy for public sector pay
  • Prez Mahama urges organised labour to support ECG restructuring plans
  • Western Region GNFS embarks on ‘catch them young’ campaign
  • Agbana backs call for National Youth Development Fund to support young entrepreneurs

  • About Us
  • Advertise With Us
  • Terms of Use
  • Privacy Policy
  • Contact

Copyright © 2024 Myliberty Multimedia Group.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

  • Home
  • Business
  • Crime
  • Politics
  • Economy
  • Education
  • Entertainment
  • Environment
  • Health
  • Sports
  • Lifestyle
  • Technology
  • Parliament
  • Events
  • General News
  • Politics
  • Religion
  • Maritime
  • Social
  • World
  • Video News
  • TV
  • Radio
  • Podcast
Login

Copyright © 2024 Myliberty Multimedia Group.